High Metal’s biggest project in the summer of 2021 was to modernize and renew the swimming pool of Hakunila swimming hall in Vantaa.
In a big project, an old 25 x 20 meter tiled pool was transformed in the hands of our professionals into a wonderful stainless pool suitable for competition use in just a couple of months. The swimming pool intended for heavy use was designed to be both practical, durable and cost-effective, as it is intended to serve the swimming hall’s customers for several decades.
The technology for the new pool came from Pool4You (formerly Suomen Allaslaite Oy).
Watch the video of the transformation below:
Pool size: 25 x 20 meters
Petri Kalliokoski • petri.kalliokoski@highmetal.fi • +358 40 526 7122
Petri Kalliokoski petri.kalliokoski@highmetal.fi
+358 40 526 7122
For more than 70 years, we have been driven by the enthusiasm to do things in a new way – better, more efficiently and smarter. Would you like to be a part of this excitement?
Contact us and let’s think together about ways to turn your idea into a successful product.
+358 44 360 0030
info@highmetal.fi
Come to visit:
Linjatie 3, 01260 Vantaa
+358 44 360 0030
info@highmetal.fi
Linjatie 3, 01260 Vantaa