Back to references

Hakunilan uimahallin uima-altaan modernisointi

Case: Modernization of the Hakunila swimming pool

High Metal’s biggest project in the summer of 2021 was to modernize and renew the swimming pool of Hakunila swimming hall in Vantaa.

In a big project, an old 25 x 20 meter tiled pool was transformed in the hands of our professionals into a wonderful stainless pool suitable for competition use in just a couple of months. The swimming pool intended for heavy use was designed to be both practical, durable and cost-effective, as it is intended to serve the swimming hall’s customers for several decades.

The technology for the new pool came from Pool4You (formerly Suomen Allaslaite Oy).

Watch the video of the transformation below:

A swimming pool designed for competition use that offers durability.

Characteristics

Pool size: 25 x 20 meters

Ask more about swimming pool solutions
from our expert:

Contact us:

For more than 70 years, we have been driven by the enthusiasm to do things in a new way – better, more efficiently and smarter. Would you like to be a part of this excitement?

Contact us and let’s think together about ways to turn your idea into a successful product.

+358 44 360 0030
info@highmetal.fi

Come to visit:
Linjatie 3, 01260 Vantaa